Pennex Aluminum

Location: Leetonia, OH
Size: 116,435 SF
Year Completed: 2019
Industry: Industrial, Manufacturing
Project Description: Engineering Direct provided all construction documents required to permit and build the new fabrication shop building, which included all interior architectural, electrical, and mechanical engineering.